Laguna LinksVillaBang Tao, Phuket
Renovation & Engineering.
Detailed engineering plans drawn, permits obtained, and all major works completed. The villa carries infrastructure that is standard in European construction and rare in Phuket at this price point.

Renovation & Engineering.

Renovation adds measurable value. See the investment analysis →

Completed — 38 verified works

What has been built.

Laguna Links Villa master bathroom teal green tiles bathtub overhead view Phuket

Master Bathroom

Bathroom works focused on practical upgrades: new floor tiling, a new toilet, and a more efficient hot-water system serving the master bathroom.

Laguna Links Villa modern kitchen island renovation Phuket

Kitchen

Full kitchen fit-out: central island, artificial stone countertop, modern cabinetry, integrated appliances, and German Blum fittings with soft-close hardware.

Laguna Links Villa covered BBQ terrace pergola outdoor kitchen granite worktop May 2026

BBQ Terrace & Outdoor Kitchen

New outdoor BBQ area with a professional gas grill, reinforced concrete base, plumbing for the sink and water access, expanded water points, Italian porcelain terrace tiles laid with drainage falls, low-maintenance metal pergola structure, and new drains.

Laguna Links Villa covered pergola terrace pool side angle white columns May 2026

Covered Pergola Terrace

Expanded and rebuilt covered terrace with a new pergola, low-maintenance metal supports, correct drainage slope and gutters, and adjustable LED lighting. Designed as a larger communication and outdoor living zone between the interior, pool, and garden.

Laguna Links Villa pool shell waterproofed aerial view terrace side May 2026

Pool — Shell, Waterproofing & Fittings

Complete pool reconstruction: old shell stripped, new concrete poured, waterproofing render applied. All fittings (inlets, jets, drains) installed. Dedicated electrical circuit and cable routing to equipment room complete. Multicolour RGB LED lighting provision included — tile colour and finish at buyer's selection. Vendor: Re Con Engineering.

Laguna Links Villa pool new sun deck overflow edge May 2026

Pool — New Sun Deck

New engineered sun deck with integrated channels for electricity, automatic garden irrigation, drainage, and outdoor lighting. Built with provision for future garden and pool-side services rather than surface-mounted cabling.

Laguna Links Villa outdoor shower stone wall golf lake view May 2026

Outdoor Shower, Stone Wall & Golf Terrace

Combined pool-side shower and golf terrace works: natural stone wall cladding, outdoor shower provision, Italian porcelain terrace tiles, and new drains for rainwater and wash-down water. Direct views across Laguna Golf Phuket fairway and lake.

Laguna Links Villa garden lawn white fence LED uplights golf evening May 2026

Garden — Tropical Landscaping

Tropical garden with established lawn, bamboo planting, stone retaining walls, and integrated LED lighting. The former timber fence was replaced with a longer-life, low-maintenance aluminium boundary fence.

Laguna Links Villa garden sala pavilion Thai roof steps terrace May 2026

Garden Sala Pavilion

Existing garden sala retained because the pool pump room sits underneath it. Unnecessary details were removed, and a new concrete base and steps were built. Remaining works are electrical connection and final cladding in the selected material.

Laguna Links Villa front entrance path stepping stones tropical planting May 2026

Side Walkway + Natural Stone Wall

Side walkway widened after the former air-conditioning blocks were removed. The full wall is clad in natural stone, with space reserved for tropical greenery. Inch-thick Italian porcelain slabs, pebble infill, and new drains create a cleaner, modern service path.

Laguna Links Villa teak wood staircase banister view down May 2026

Natural Teak Staircase

Following the architect's advice, the original teak staircase was retained. The old gloss finish was removed, the timber was restored, and the steps were refinished with a matte protective lacquer.

Laguna Links Villa upper landing linear LED track lighting oval mirror console May 2026

Main Bedroom Lighting & HRV Aircon System

Main bedroom engineering works include modern lighting, fresh-air HRV ventilation, and a new air-conditioning system. The ceiling and service routes were prepared for integrated lighting, ventilation, and climate control.

Laguna Links Villa main bedroom walk-in wardrobe HPL panels custom joinery May 2026

Main Bedroom Walk-in Wardrobe

Custom-made walk-in wardrobe for the main bedroom, built with HPL panels, quality components, and durable fittings. Designed as a practical storage and dressing zone with clean light-wood joinery.

Laguna Links Villa guest bedroom built-in wardrobe light wood open shelving May 2026

Guest Bedroom — Built-in Wardrobe

Full-height built-in wardrobe in light wood-grain laminate with multiple compartments, open shelving and drawer units.

Laguna Links Villa rooftop Daikin VRV outdoor condensing unit May 2026

Daikin VRV — Outdoor Rooftop Unit

Single commercial-grade outdoor condensing unit on the rooftop — hotel standard, not residential. Manages all indoor cassette units throughout the villa. Low noise, high efficiency.

Laguna Links Villa Daikin VRV ceiling cassette AC unit close-up May 2026

Daikin VRV/HRV — Ceiling Cassette Units

Ceiling-cassette VRV indoor units installed in bedrooms. Each cassette unit visible in ceiling reveal, with integrated HRV fresh air ventilation and linear LED ceiling lighting.

Laguna Links Villa flat roof waterproof membrane lake golf view May 2026

Roof — Waterproofing & Membrane

Full roof waterproofing: epoxy resin reinforcement and waterproof membrane over the entire flat roof surface. Views across the Laguna Golf lake from the rooftop.

Laguna Links Villa water filtration room softener blue filter pump May 2026

Water Filtration System

Multi-stage water filtration: sediment filters, pressure manifold, water softener, and high-pressure pump system. Clean, filtered water at every tap throughout the villa.

Laguna Links Villa garage SUV dark tile floor roller door May 2026

Garage — Dark Tile Floor + Roller Door

Garage rebuilt with natural stone floor surface and RGB LED lighting. Large-format porcelain tiles around the perimeter. Aluminium roller door with remote access. Full dual-SUV clearance. EV charger conduit pre-run.

Laguna Links Villa utility room washing machine storage shelves May 2026

Utility Room — Laundry & Storage

Ground-floor utility room: all plumbing updated, washing machine area with full drainage, grey modular shelving system, and black utility sink. Garden door access.

Engineering & Systems

Embedded Engineering Systems

What's built into the building.

Beyond the visible renovation, the villa carries significant engineering infrastructure — systems that are typically absent at this price point in Phuket.

Water & Plumbing

  • High-Pressure Pumps

    New high-power pump system installed in the utility room. Ensures consistent water pressure throughout the villa.

  • Multi-Stage Water Filtration

    Sediment filter, pressure manifold, and full purification system covering the entire villa. Clean, filtered water at every tap.

  • Water Heaters Replaced Throughout

    All water heaters replaced across every bathroom and service zone.

  • Outdoor Kitchen Plumbing

    Full hot and cold water supply to the BBQ terrace: grill area and sink, fully plumbed with drainage.

  • Outdoor Shower Plumbing

    Full supply and drainage for the pool-side outdoor shower and foot-wash tap.

  • Pool Plumbing Fully Rebuilt

    Complete pipework rebuild inside pool walls. All fittings — inlets, jets, drains — installed and pressure-tested. Ready for tile finish.

  • Utility Room — All Pipework Updated

    Ground floor utility room: all supply and drainage lines renewed. Washing machine area, drainage channels, and service lines fully updated.

Electrical & Lighting

  • Outdoor Wiring — Full External Circuit

    All exterior electrical circuits installed and weather-proofed: terrace lighting, pool surround, outdoor shower area, BBQ zone. Meets Thai electrical code.

  • Pool Electrics — Dedicated Circuit

    Dedicated electrical circuit and cable routing to pool equipment room. Sized for pump, filtration, and future heating.

  • EV Charger — Ready to Connect

    Dedicated conduit and cables run to the garage for EV charging. Plug-and-play connection for any standard EV charger — no additional electrical works required.

  • Main Bedroom Lighting

    Modern lighting works completed in the main bedroom, with ceiling and service routes prepared for a cleaner architectural finish.

  • Natural Teak Staircase Restoration

    Original teak staircase retained, stripped back from its previous gloss finish, restored, and protected with a matte lacquer.

  • Full Interior Repaint

    Entire villa interior repainted white. Clean, consistent finish throughout all rooms and common areas.

Smart Infrastructure

  • KNX Smart Home Cabling

    Bus cables pre-routed throughout the villa for future KNX home automation — lighting, climate, access control. No controller required at purchase; infrastructure is in place and installation-ready.

  • Fibre Optic Internet

    Fibre optic cable connected to the villa. High-speed internet available throughout.

  • Automatic Entrance Gate

    Motorised entrance gate with remote and keypad access. Installed at street level.

HVAC & Ventilation

  • Daikin HRV — Heat Recovery Ventilation

    Fresh-air ventilation installed for the main bedroom system. Supplies continuous outdoor air while recovering heat from outgoing stale air — maintains air quality without energy waste. Standard in European premium construction; rare in Phuket at this price point.

  • Daikin VRV — All Rooms

    VRV system covers both upper-floor bedrooms, the ground floor bedroom, and the storage room. Single commercial outdoor unit manages all indoor units efficiently.

  • Ground Floor Bedroom — Full HVAC Works

    All AC engineering and ventilation integration completed for the fourth bedroom on the ground floor.

  • Storage Room AC

    Air conditioning installed in the dedicated storage room for climate-controlled storage year-round.

Structure & Envelope

  • Roof — Full Insulation & Waterproofing

    Interior: expanding foam insulation applied to roof underside. Exterior: reinforcing tape and epoxy resin over entire roof surface, finished with waterproof paint. Dual thermal and moisture barrier.

  • Ground Floor Canopies Rebuilt

    Extended canopies rebuilt in metal and composite materials with correct drainage slopes and gutters installed. Low-maintenance finish.

  • Ground Floor Large-Format Porcelain Tiles

    Large-format grey porcelain tiles laid throughout ground floor living and dining areas.

  • Side Driveway — Stone Brick Pavers

    New grey stone brick paver pathway along the side of the building.

Related

Inquire NowWhatsApp